BEC preparation

From Quantum kot
Revision as of 18:06, 3 January 2020 by Kot (talk | contribs) (→‎January 2020)
Jump to navigation Jump to search

There are 28 steps in electronics while the ultracold atomic cloud is prepared.

  1. MOT preparation

Magnetic coils

Inductance 40 mH, How the switch on time is different from switch off, why it moves during one process?

January 2020

Measurement with a network analyzer:

Resonant freq. [kHz] Capacitance Conditions
1510 MHz 0 Only the coil
718.25 0.47 nF
520 102
371 kHz 2.2 nF
173.75 103