Difference between revisions of "Lab Book PrYSiO"
Jump to navigation
Jump to search
| Line 25: | Line 25: | ||
* check leakage | * check leakage | ||
* spool the magnets | * spool the magnets | ||
| + | * check the magnets for quenching | ||
| + | * check external fluctuations of magnetic field | ||
| + | * keep vibrations of cryo in mind | ||
| + | * calibrate magnets with Erbium | ||
==28 September 2019== | ==28 September 2019== | ||
Revision as of 09:24, 30 September 2019
To do list:
- increase output laser power
- is it stably locked?
- better dye? rhodamine b with methanol solvent.
- Kazakhstan package
- receive
- check
- overview
- Homodyne
- Red pitaya
- check potentiometer
- run DDS
- PWR spply control
- scheme layout
- cryostat
- remove magnets
- leakage detection
- install it back
- buy gloves
30 September 2019
- install eom
- check laser linewidth
- check Pr sample
- check leakage
- spool the magnets
- check the magnets for quenching
- check external fluctuations of magnetic field
- keep vibrations of cryo in mind
- calibrate magnets with Erbium
28 September 2019
- PCB way responded
27 September 2019
- Dye laser is tuned to 606 nm, low output power up to 300 mW.